Preferences

Privacy is important to us, so you have the option of disabling certain types of storage that may not be necessary for the basic functioning of the website. Blocking categories may impact your experience on the website. More information

These items are required to enable basic website functionality.

Always active

These items are used to deliver advertising that is more relevant to you and your interests.

These items allow the website to remember choices you make (such as your user name, language, or the region you are in) and provide enhanced, more personal features.

These items help the website operator understand how its website performs, how visitors interact with the site, and whether there may be technical issues.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Structural Works

  • The 12th residential floor has been cast.

Parking Levels

P1

  • Internal partition walls completed.
  • Plastering of technical rooms completed.

P2

  • Suspended electrical cables for lighting installed.
  • Water supply piping completed.
  • Final plastering works are in progress.

1st Residential Floor

  • Ventilation installation in the corridors is approximately 70–80% complete.
  • Final painting in the showroom has been completed.
  • Tile installation completed in two bathrooms and the walk-in closet.
  • Corridors are ready for final painting.

2nd Residential Floor

  • Wall priming completed.
  • Engineering utility piping installed within the floor slab.
  • Corridors are ready for final painting.

3rd Residential Floor

  • Plastering works fully completed.
  • Wall priming completed.
  • Engineering utility piping installed within the floor slab.
  • Corridors are ready for final painting.

4th Residential Floor

  • Plastering works fully completed.
  • Rough plastering is underway in the corridors (wall priming has not yet started).
  • Installation of engineering services is ongoing, including water supply, electrical, and gas systems.

5th Residential Floor

  • Installation of engineering services is ongoing, including water supply, electrical, and gas systems.

6th Residential Floor

  • Installation of engineering services has commenced.

7th Residential Floor

  • Internal partition masonry is approximately 70–80% complete.

8th Residential Floor

  • Internal partition masonry has commenced.