Construction at OAK Yard Residences continues to advance, with significant progress in interior finishing, electrical installations, ventilation systems, and window installation.
As of November 12, 2026, the following works have been completed or are currently underway:
- 1st Floor: Window installation and wall tiling have started.
- 2nd–3rd Floors: Ceiling installation has been completed.
- 4th Floor: Preparation for ceiling installation is underway.
- 5th–9th Floors: Exhaust ventilation installation and electrical rough-in works have been completed.
- 10th–11th Floors: Electrical rough-in works have been completed.
- 12th Floor: Wall priming has been completed, and preparation for exhaust ventilation installation has started.
- 13th Floor: Plastering works have been completed.
- 14th Floor: MEP rough-in works are nearing completion, and door frame profiles are being installed.
- Coworking Area: All MEP systems have been installed, and floor tiling has started.
These developments mark continued progress across multiple floors and shared spaces as OAK Yard Residences moves forward through its construction stages.